Phase 01 · Survey & design
Design around what the plant needs to do
Use cases & goals
Applications on the network — AGV/AMR, machine vision, robotics, sensors, remote ops — and the latency, availability and continuity each one needs.
RF & site survey
Coverage zones across factory, warehouse or outdoor areas; tower, pole and small-cell spots; power and backhaul; licensed or captive spectrum.
Architecture & sizing
On-prem, hybrid or cloud; central control with site-local UPF; HA 1+1 with DC–DR; every function inside the customer's network perimeter.
Where the products come in
Starts the twin: enterprise → region → plant, port or campus → zone, with the assets and processes each zone runs. 2D/3D RF coverage planning [roadmap].
Sized to the device and throughput plan — Model A 1 Gbps · 1K, B 5 Gbps · 10K, C 10 Gbps · 20K, D 20 Gbps · 50K subscribers.